Pavement Rehabilitation Project
Project Description: The Work shall include striping removal, crack sealing, pavement grinding, localized asphalt concrete repair, asphalt overlays, slurry seal, pavement reconstruction, curb and gutter repair, curb ramp installment/replacement, installation of traffic striping and markings, installation of traffic signage, and utility adjustments. Work shall be completed within 90 days from the date when Contract Time commences to run.