Median Modifications at Foster City Blvd (CIP 301-635)

Bid/RFP Status: 
Open - accepting bids and proposals
Bid/RFP Due Date: 
Wednesday, April 9, 2025 - 2:00pm

The Median Modification and Road Improvements at Foster City Boulevard Project is the combining of CIP 301-635 and 301-637. The project was developed as part of the Engineering Feasibility Study Final Report (May 2009) to address traffic related impacts from proposed development projects in Foster City. The projects are identified as Multi-Project #3, in the study. The project is being designed by the City’s design consultant, BKF Engineers, and the scope involves:

  • MP #3: The project will lengthen northbound left-turn lane on Foster City Boulevard at Chess Drive. Increasing the length of the existing 525-foot northbound left-turn lanes from Foster City Boulevard at Chess Drive to 650-feet will prevent queues from extending out of the turn lanes and blocking through traffic on Foster City Boulevard.

This project includes striping removal, concrete, curb, and paver removal, concrete curb installation, installation of pavers, installation of traffic striping and markings and grade adjustments.

BarkerBlue Link: https://www.barkerblueplanroom.com/projects/336/details/median-modifications-on-foster-city-blvd-project-cip-301-635

Questions due to the City: April 3, 2025, at 2pm.

Bid Closes: 2pm on Wednesday, April 9, 2025

For questions, contact Jerrick Carandang, Associate Engineer at jcarandang@fostercity.org