Shell Bridge Sanitary Sewer Force Main Rehabilitation (CIP 455-710)

Project Status: 
Under Review
Project Type: 
Capital Project
Last Updated:
05/21/2024 - 12:22pm
force main - shell

Description

The existing 16-inch force main along Shell Blvd Bridge was originally constructed in the 1960’s and is a critical facility which delivers over 500,000 gallons of sewage (approximately one-third of the wastewater generated in the City) daily to the San Mateo Wastewater Treatment Plant. During a routine maintenance inspection, a small crack was identified on the top side of the force main which called for a repair. The repairs were completed in February 2021 and included the in-house replacement of the air release valve located on the force main at the high point on the bridge. The repair was only a temporary fix, and a permanent solution is being reviewed.  This project will rehabilitate or replace the existing force main.

Contact Information

Public Works Department

Engineering Division
610 Foster City Boulevard
Foster City, CA  94404
Phone: (650) 286-3270
Fax: (650) 345-4626
Email: publicworks@fostercity.org
Monday - Friday, 8 am - 5 pm

Maintenance Division
100 Lincoln Centre Drive
Foster City, CA  94404
Phone: (650) 286-8140
Fax: (650) 349-7204
Email: publicworks@fostercity.org
Monday - Thursday, 8 am - 4:30 pm
Friday, 8 am - 3:30 pm​
(By appointment only)