Edgewater Park Concrete Walkway Replacement Project (CIP 301-674)
Description
The work includes, without limitation, providing all labor, material, and equipment necessary to perform the work specified in the Plans and Specifications including but not limited to procurement and installation of material for traffic control, construction fencing, removal and installation of concrete pavement, tying into existing sidewalk and other remaining concrete, salvage Kiosk, park benches, and water fountain, reinstall kiosk, park benches and water fountain at end of the project. Storm Drain inlet elevation adjustment, Christy box elevation adjustment, Irrigation valve box elevation adjustment. Details of work are described within the Contract Documents. Work shall be completed within 14 calendar Days from the date when Contract Time commences to run.
For more information regarding this Capital Improvement Project, please contact Pete Chiamos, Parks Manager at 650-286-3549.