CIP 301-671: Edgewater Walkway Project
print friendly textonly

CIP 301-674: Edgewater Park Concrete Walkway Replacement Project

   

CIP674

For more information regarding this Capital Improvement Project, please contact Pete Chiamos, Parks Manager at 650-286-3549.

Description:

The work includes, without limitation, providing all labor, material, and equipment necessary to perform the work specified in the Plans and Specifications including but not limited to procurement and installation of material for traffic control, construction fencing, removal and installation of concrete pavement, tying into existing sidewalk and other remaining concrete, salvage Kiosk, park benches, and water fountain, reinstall kiosk, park benches and water fountain at end of the project. Storm Drain inlet elevation adjustment, Christy box elevation adjustment, Irrigation valve box elevation adjustment. Details of work are described within the Contract Documents. Work shall be completed within 14 calendar Days from the date when Contract Time commences to run.


Project Status:

The City of Foster City has finalized plans, specifications, and bid documents. Plans, specifications, and bid documents will be sent out for bid October 18, 2017. Bid opening will be at 2:00pm at City Hall, 610 Foster City Blvd. Foster City, Ca 94404 on November 9, 2017. Follow this link to the plans and specifications.

 

City Hall - 610 Foster City Blvd.
Foster City, CA 94404
(650) 286-3200